Zenith

Success stories

Projects

Discover projects where our methodology helped optimize schedules, costs, coordination, and execution in industrial, corporate, and commercial developments.

Success stories

Project Management

Projects where Zenith coordinated execution, supervision, bidding, design, technical follow-up, and construction control for industrial and corporate developments and specialized spaces.

VRI New Building
01

New Building

Green Field project for speculative building. Project Management and Supervision. 13,500 m².

13,500 m² 12 months 2023
Valeo Expansion
02

Expansion

Expansion to house clean rooms. Service Management and Pre-Construction Studies in 12,000 m².

12,000 m² 12 months 2024-2025
ADI Offices QRO
03

Offices QRO

Office remodel with Project Management, Design, and Supervision in 1,638 m².

1,638 m² 3 months 2026
Ergomomia Project
04

Ergomomia Project

Engineering, Project Management, and Support for the bidding of a Conveyor and Scanner system modernization. 1,068 m².

1,068 m² 2026
Tableting Machine Project
05

Tableting Machine Project

Engineering adaptation for the installation of a new machine. Multidisciplinary Design and Engineering.

Design 2026
ADI Offices SLP
06

Offices SLP

Office remodel. Cost Management service in a 6500 m² area.

6500 m² 2026
Los Olivos Project
07

Project

New 5,000 m² industrial warehouse with comprehensive Project Management and on-site supervision.

5,000 m² 8 months 2025-2026
Mixers Project
08

Mixers Project

Design and engineering development and Project Management for the improvement and upgrade of a mixer. 1,000 m².

1,000 m² 12 months 2025-2027
Querétaro Industrial Park
09

Querétaro Industrial Park

450,000 m² industrial park for companies with high electrical demand. Business plan and Project Management.

450,000 m² 12 months 2023
Pedro Escobedo Industrial Park
10

Pedro Escobedo Industrial Park

280,000 m² logistics industrial park. Business plan, Design, and Engineering for a large-scale development.

280,000 m² 6 months 2025
Valeo Laboratory Expansion
11

Building Expansion

3,000 m² expansion for laboratory, offices, warehouse, and workshop. Comprehensive Project Management.

3,000 m² 12 months 2024-2025
Valeo Thermal Expansion
12

Thermal Expansion

Expansion of a 3,000 m² building for a production area. Project Management with 18 months of continuous service.

3,000 m² 18 months 2024-2025
Success stories

Design & Engineering

Projects where Zenith developed architectural design, multidisciplinary engineering, BIM modeling, and technical solutions for various sectors and needs.

Industrial Expansion
01

Industrial Expansion

Plant expansion for new production and storage lines with flexible design. Design, engineering, and cost management in 10,000 m².

10,000 m² 4 months 2024
Testing Laboratory
02

Testing Laboratory

Preliminary design to size the required areas of an automotive radiator testing laboratory. Development of a preliminary technical-architectural layout.

Preliminary design 2025
Fire Protection System
03

Fire Protection System

Guaranteed regulatory compliance and protection of critical assets in high-density logistics areas. Design and Engineering in 3,000 m².

3,000 m² 3 months 2025
Food & Retail
04

Food & Retail

Development of a preliminary technical-architectural layout to size the required areas. Design and engineering in 250 m².

250 m² 3 months 2025
HVAC Engineering
05

HVAC Engineering

Development of calculation reports and drawings for electrical and HVAC systems at level 15 and 17. Design and Engineering in 350 m².

350 m² 2 months 2024
Comprehensive MEP Project
06

Comprehensive MEP Project

Preparation of reports, calculations, and executive drawings for hydraulic, sanitary, electrical, LP gas, HVAC, and specialty systems installations in 500 m².

500 m² 2 months 2025
Restaurants
07

Restaurants

Development of a preliminary technical-architectural layout to size the required areas. Design and engineering in 150 m².

150 m² 2 months 2026
Industrial Cafeteria
08

Industrial Cafeteria

Engineering, quantification, and drawings for the expansion of an industrial cafeteria. Design and engineering in 250 m².

250 m² 1 month 2025
Grupo Modelo
09

Brewing Group

SCI Design and Engineering for 20,000 m² facilities. Specialized technical solutions for industrial infrastructure.

20,000 m² 4 months 2026
HF Presses
10

Presses Project

Development of a preliminary technical-architectural layout to size the required areas. Design and engineering in 150 m².

150 m² 2 months 2026
Alcalde Project
11

fast food Project

Development of Low Voltage electrical installations for a new branch. Design and engineering in 256.74 m².

256.74 m² Design 2025
Historiadores Project
12

fast food Project

Development of Low Voltage electrical installations for a new branch. Design and engineering in 201 m².

201 m² Design 2025
Stadium Projects
13

fast food Projects

Development of Low Voltage electrical installations for a new facility. SCI Design and Engineering.

Design SCI 2025